Development and Installation of a prototype hydro-powered water pump and electricity generator

Karakoram International University desires to engage Local/National Consultant on the basis Single Stage Two Envelops (SSTE) procedure, for design, construction and supervision of the HEC funded the project “To develop and Install a Prototype Hydro-powered water pump and Electricity Generator” under Technology Development Fund (03-214):

Applications are invited from well-reputed local/ national level consulting firms, having sufficient experience of Planning, Designing, Construction, and Supervision of Ultra Low-head Turbine Electricity Generator and Water Pumps.

Detailed scope of consultancy services, list of required documents/credentials and terms and conditions and pre-qualification criteria can be downloaded from the given link below.

The Bid/application comprising of Technical and Financial proposal separately sealed in common sealed envelope and addressed to the undersigned, should reach the following address through post/registered courier on or before 19th December 2019 (11:00 am), which will be opened in presence of the committee members and bidders at 11:30 am on the same date. Applications received after the given time and date shall not be considered.

 

(Prof. Dr. AttaullahShah )

Principal Investigator (PI)

Karakoram International University, Gilgit (PI)

android APK